WEYMOUTH COMPRESSOR STATION UPDATE

The Federal Energy Regulatory Commission (FERC) will hear the FRRACS (Fore River Residents Against the Compressor Station) briefing on Thursday, January 20, 2022. Previous posts have indicated that the Weymouth compressor station was put in the wrong place at the wrong time and was never required by anyone anyway. We need to move away from fracked gas. With luck, or perhaps a miracle, this atrocity will be shut down permanently. For a novel with facts about this read A BRIDGE TO OBLIVION on Kindle. Join the FERC meeting via the link provided: https://www.ferc.gov/news-events/events/january-20-2022-virtual-open-meeting-01202022
https://www.nocompressor.com